Comprehensive Development of an Investment Project for a Cement Plant Construction

PROJECT OVERVIEW

Comprehensive Development of an Investment Project for a Cement Plant Construction

Project: International Investment Structuring (Middle East)

Client: Janaen Waset For General Contracting Co. (Iraq)

Role: Lead Investment Architect / Due Diligence Expert

  1. Situation and Challenge

A foreign company approached us with a preliminary feasibility study and a raw material extraction license. The task was ambitious: to prepare the asset for attracting international financing.

During the initial analysis, we identified critical systemic errors in the local documentation:

  • Absence of a high-quality financial model.
  • Unsuitability of economic parameters for real-world investment.
  • Risks rendering the project unapprovable by banks in its current form.
  1. Our Solution

We did not simply “correct typos.” We conducted a deep investment audit and proposed a concept for a complete project overhaul:

  • Business Activity Modeling: Construction of a dynamic financial model accounting for all regional risks.
  • Development of Calculation Parameters: Determination of the exact volume of required financing, Internal Rate of Return (IRR), and payback periods.
  • Preparation of Investment Documentation: Creation of a document package compliant with international standards (UNIDO/World Bank).
  1. Result and Significance

Following negotiations in Moscow, an Agreement for the comprehensive development of the project was signed.

This marked the first instance where a Russian consulting company took on the management of a major infrastructure facility abroad.

The client acknowledged that our competence in planning and developing investment projects significantly exceeds the capabilities of local performers.

The project received a clear roadmap for securing financing.

Leave a reply